[DCN-TechOps] Monthly Downtime Report
John M. Crowell
jcrowell at dcn.davis.ca.us
Thu Feb 1 01:39:29 PST 2007
Monthly System Availability Report: January 2007
Systems:
wheel:
00:00 01-Feb-07 uptime = 8 days 4:13 hours
23Jan07 18:06-19:47 Wheel shut down during power outage (1:41)
web:
Scheduled interruptions every Saturday midnight
for cycling log files. downtime ~1 min.
spoke:
00:00 01-Feb-07 uptime = 8 days 4:13 hours
23Jan07 18:07-19:47 Spoke shut during power outage. (1:40)
indra:
00:00 01-Feb-07 uptime = 8 days 4:05 hours
22Jan07 21:13-22:34 Indra down to move power to new UPS. (1:21)
23Jan07 18:09-19:55 Indra shut down during power outage. (1:47)
crank
00:00 01-Feb-06 uptime = 8 days 4:07 hours
23Jan07 18:25-19:53 Crank shut down during power outage. (1:28)
barracuda
23Jan07 17:52-20:01 Barracuda shut down during power outage.(2:09)
Modems:
23Jan07 18:06-19:47 Modems down during power outage (1:41)
Network:
23Jan07 18:31-19:47 Network down during power outage (1:16)
----------------------------------------------------------------------
John M. Crowell Learn from the Past
Davis Community Network Live for Today
DCN Systems Manager Look to Tomorrow
netadmin at dcn.davis.ca.us Take a Nap This Afternoon
Sacramento Master Singers
Music Librarian
jcrowell at mastersingers.org
______________________________________________________________________
More information about the DCN-Technical-Committee
mailing list